South Wing 2
Given the great differences in site levels, the Porto Senate was petitioned to ensure that all waste from city building works and flood debris from the River Douro was dumped at the site to create a level surface.
Given the great differences in site levels, the Porto Senate was petitioned to ensure that all waste from city building works and flood debris from the River Douro was dumped at the site to create a level surface.